![]() ![]() The over current protection switch limits the power strip's working current to certain setting, so it will not get hot during usage. ★Safety and Certificate:ETL safety certified,with extension cord and other major components certified by UL.★12 AC Surge Protector Outlets:The 3 level complementary Surge Protector Circuit which composed of TVS (transient voltage suppressor),MOV (metal oxide varistor), GDT (gas discharge tube), with minimum 2700 Joules energy absorbing capacity, could protect your devices much more quickly and reliably than other brand’s 1 level MOV Surge Protection Circuits.Built- with smart technology, detecting charging devices and deliver optimal charging speed automatically, compatible with Kindle and most USB devices. ★Surge Protector Power Strip with usb:2 Special design widely spacing AC outlets (2 inches) for large adapters with 10 standard spacing outlets,4 USB ports total 3.4 A/17W, each USB A port features 2.4A Max output.★Multi Function Power Strip:Power strip surge protector with 12AC outlets & 4 USB charging ports (5V/3.4A,17W), 6-foot Heavy Duty power extension cord(1875W/15A), surge protector (2700 Joules)with overload protection protects against spikes and fluctuations.Wide range voltage design, can be used on 120v to 240v circuit.“This work is expected to begin late summer, and Port Taranaki will again provide berth space for offshore support vessels, and receive and store the well head equipment. Port Taranaki is also looking forward to supporting the third and final phase of the decommissioning – the plugging and abandoning of the wells. “We had a great relationship with their team and it’s great our port – our facilities, lifting equipment, laydown areas, and skills – were utilised throughout.” Port Taranaki head of commercial Ross Dingle says the port was pleased to have worked alongside Shelf Subsea to ensure the important project was carried out efficiently. I was really impressed with how accommodating they were, especially at short notice a number of times,” David says. They understood we were running an offshore operation that could be affected by weather, so flexibility of schedule was needed. “But overall, the guys offshore did a fantastic job of maintaining the schedule, and Port Taranaki were amazing. ![]() “We had some weather delays – the weather and swell conditions at the site can be quite different and more severe than here in New Plymouth, where we are a bit more protected. During the course of phase two, Southern Star made 12 visits to Port Taranaki to deliver the retrieved equipment, and David says regular communication was crucial to the project staying on schedule. ![]() “Most were Kiwis, which was great to utilise their knowledge and expertise,” says Shelf Subsea project director David McCarthy.Īnd the Trans-Tasman teamwork didn’t stop there. Purpose built diving vessel Southern Star supported the work at the field throughout, with about 100 personnel onboard during the initial diving and preparatory period, and 70 during the equipment recovery. Over four months, Australia-based specialist Shelf Subsea disconnected and removed about 360 tonnes of subsea steel structures and almost 40km of flexible lines from the Tui oil field. We may be fierce competitors on the sports field, but the teamwork of Aussies and Kiwis at the Tui oil field ensured phase two of the decommissioning project was a success. ![]()
0 Comments
Leave a Reply. |